Roadmap
The six phases from prototype to public release.
| Phase | Scope | Result |
|---|---|---|
| 0 · Prototype ✓ | Interactive design prototype of dashboard, posts, editor, statistics, post journey and consent | The look is decided before code exists |
| 1 · Foundation ✓ | Laravel without a database, file models, index, routing, languages, Blade themes, page cache, images, feeds, maintenance without cron, setup and sign-in | A multilingual website runs from Markdown files |
| 2 · Analytics & consent ✓ | hit.php, beacon, raw data, daily and monthly sums, banner, categories, two-click embeds, consent proof, both tracking levels, dashboard and statistics, MCP server with tokens and statistics tools |
The heart of Wake works, and you can already ask it questions |
| 3 · Writing ✓ | Posts, pages, custom types, editor with cards, media, revisions, translations, scheduling, stats in the editor, roles, MCP content tools, approval mode, history | You can write and publish in the browser |
| 4 · Finish ✓ | Default theme Tide, Ghost import, content API, updates from the panel, installation ZIP, complete documentation | Wake 1.0 |
| 5 · Pilot ← next | First real website: theme, import, move, live operation | Wake runs in production |
| 6 · Growth | WordPress import, webhooks, project website, public release | Wake is public |
Every phase ends with tests (Pest). Documentation is written alongside, not in phase 4: phase 4 only fills the gaps.
source: docs/project/roadmap.md